{"id":2509,"date":"2022-11-10T10:03:00","date_gmt":"2022-11-10T10:03:00","guid":{"rendered":"https:\/\/konstruktion.vamtam.com\/?p=2509"},"modified":"2023-08-31T20:12:38","modified_gmt":"2023-08-31T20:12:38","slug":"al-muhailib-ready-mix-factories-company-started-the-pouring-works","status":"publish","type":"post","link":"https:\/\/almohileb.net\/eng\/al-muhailib-ready-mix-factories-company-started-the-pouring-works\/","title":{"rendered":"Al-Muhailib Ready-Mix Factories Company started the pouring works"},"content":{"rendered":"\t\t<div data-elementor-type=\"wp-post\" data-elementor-id=\"2509\" class=\"elementor elementor-2509\" data-elementor-post-type=\"post\">\n\t\t\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-3263582a elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"3263582a\" data-element_type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-no\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-1352d9e3\" data-id=\"1352d9e3\" data-element_type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-36c083a7 elementor-widget elementor-widget-text-editor\" data-id=\"36c083a7\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t\t\t\t\t\tAl-Muhailib Ready-Mix Factories Company started the pouring works in the runway and the aircraft parking areas with the expansion of Arar Airport, where the supply started with special concrete called Paving concrete, which is concrete with special components that are spread with equipment dedicated to this work.\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":"<p>Al-Muhailib Ready-Mix Factories Company started the pouring works in the runway and the aircraft parking areas with the expansion of Arar Airport, where the supply started with special concrete called Paving concrete, which is concrete with special components that are spread with equipment dedicated to this work.<\/p>\n","protected":false},"author":1,"featured_media":987960,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[55],"tags":[12,21,25],"class_list":["post-2509","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-awards","tag-innovations","tag-project"],"_links":{"self":[{"href":"https:\/\/almohileb.net\/eng\/wp-json\/wp\/v2\/posts\/2509","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/almohileb.net\/eng\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/almohileb.net\/eng\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/almohileb.net\/eng\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/almohileb.net\/eng\/wp-json\/wp\/v2\/comments?post=2509"}],"version-history":[{"count":8,"href":"https:\/\/almohileb.net\/eng\/wp-json\/wp\/v2\/posts\/2509\/revisions"}],"predecessor-version":[{"id":987973,"href":"https:\/\/almohileb.net\/eng\/wp-json\/wp\/v2\/posts\/2509\/revisions\/987973"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/almohileb.net\/eng\/wp-json\/wp\/v2\/media\/987960"}],"wp:attachment":[{"href":"https:\/\/almohileb.net\/eng\/wp-json\/wp\/v2\/media?parent=2509"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/almohileb.net\/eng\/wp-json\/wp\/v2\/categories?post=2509"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/almohileb.net\/eng\/wp-json\/wp\/v2\/tags?post=2509"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}